Publication:
Study of factors influencing construction delays at rural area in Malaysia

dc.citedby11
dc.contributor.authorRamli M.Z.en_US
dc.contributor.authorMalek M.A.en_US
dc.contributor.authorHanipah M.H.en_US
dc.contributor.authorLin C.L.en_US
dc.contributor.authorMahamad Sukri M.F.en_US
dc.contributor.authorZawawi M.H.en_US
dc.contributor.authorZainal Abidin M.Z.en_US
dc.contributor.authorMohamad Fuad N.F.S.en_US
dc.contributor.authorid57195984780en_US
dc.contributor.authorid55636320055en_US
dc.contributor.authorid57188734051en_US
dc.contributor.authorid57203358536en_US
dc.contributor.authorid57203354660en_US
dc.contributor.authorid39162217600en_US
dc.contributor.authorid57203352288en_US
dc.contributor.authorid57192991299en_US
dc.date.accessioned2023-05-29T06:51:31Z
dc.date.available2023-05-29T06:51:31Z
dc.date.issued2018
dc.descriptionConstruction equipment; Contractors; Economics; Surveys; Construction delays; Construction method; Economic growths; Importance index; Private projects; Questionnaire data; Questionnaire surveys; Rural constructions; Rural areasen_US
dc.description.abstractConstruction is one of an important industry which contributes to the economic growth in Malaysia. However, it has been revealed that 79.5 percent and 66.7 percent of the public and private projects were not completed within the time specified in the contracts out of 359 projects in Malaysia. Therefore, the purpose of this study is to investigate the delay factor caused project delay at rural area. A 5-points Likert scale questionnaire survey were answered by 111 respondents which having experience with rural construction project. The questionnaire data were analysed by using Relative Importance Index (RII). Five top factors were determined from this study based on their RII values which are improper construction method implemented by contractor, weather condition, difficulties in providing delivery to site, breakdown of site equipment, and poor qualification of contractor's technical staffs. � Published under licence by IOP Publishing Ltd.en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo12017
dc.identifier.doi10.1088/1742-6596/1049/1/012017
dc.identifier.issue1
dc.identifier.scopus2-s2.0-85051402839
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85051402839&doi=10.1088%2f1742-6596%2f1049%2f1%2f012017&partnerID=40&md5=bdd1c0401e60673a64f031676baf55c7
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/23752
dc.identifier.volume1049
dc.publisherInstitute of Physics Publishingen_US
dc.relation.ispartofAll Open Access, Gold
dc.sourceScopus
dc.sourcetitleJournal of Physics: Conference Series
dc.titleStudy of factors influencing construction delays at rural area in Malaysiaen_US
dc.typeConference Paperen_US