Publication:
Urban Flood Impact Assessment for the Electricity Supply Industry in Malaysia

dc.contributor.authorRostam N.E.B.en_US
dc.contributor.authorMohd Sidek L.en_US
dc.contributor.authorMarufuzzaman M.en_US
dc.contributor.authorFai C.M.en_US
dc.contributor.authorBasri H.en_US
dc.contributor.authorAhmad R.D.R.en_US
dc.contributor.authorHayder G.en_US
dc.contributor.authorid57189243038en_US
dc.contributor.authorid35070506500en_US
dc.contributor.authorid57205234835en_US
dc.contributor.authorid57214146115en_US
dc.contributor.authorid57065823300en_US
dc.contributor.authorid57212461901en_US
dc.contributor.authorid56239664100en_US
dc.date.accessioned2023-05-29T08:14:56Z
dc.date.available2023-05-29T08:14:56Z
dc.date.issued2020
dc.description.abstractFlooding has become one of the most rapidly growing types of natural disasters that have spread around the globe. In December 2014, 21 fatalities cases have been recorded and more than 200,000 people have been evacuated in Malaysia due to flood. Tenaga Nasional Berhad (TNB) has provided the structure mitigation for their substations after their assets been affected by the flood. This research identified the flood risk impact on the electricity supply industries in Malaysia by using TNB as the case study. Therefore, the main objective of this study is to identify the substation that exposed to flood risk at the Klang river basin and the possible mitigation measures to reduce the flooding impact. The flood risk assessment has been conducted by overlay the existing flood hazard map for the Klang river basin by using ArcGIS. The results showed that 473 TNB�s substations located in flood-prone for 100-years ARI�s. After doing several discussions with TNB Distribution, the research identified the suitable mitigation measures and estimated value on mitigation costs needed to protect the substation. Based on this study, a simple guideline has been developed for TNB management for their future planning. � 2020, Springer Nature Singapore Pte Ltd.en_US
dc.description.natureFinalen_US
dc.identifier.doi10.1007/978-981-15-1971-0_24
dc.identifier.epage244
dc.identifier.scopus2-s2.0-85076728415
dc.identifier.spage237
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85076728415&doi=10.1007%2f978-981-15-1971-0_24&partnerID=40&md5=83ba95ee8de68d7e2fd5924964d8f151
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/25830
dc.publisherSpringeren_US
dc.sourceScopus
dc.sourcetitleWater Resources Development and Management
dc.titleUrban Flood Impact Assessment for the Electricity Supply Industry in Malaysiaen_US
dc.typeBook Chapteren_US
dspace.entity.typePublication
Files
Collections