Publication:
Influence of project type, location and area towards construction delay: A review on significance level of delay factors

dc.citedby2
dc.contributor.authorRamli M.Z.en_US
dc.contributor.authorMalek M.A.en_US
dc.contributor.authorHamid B.en_US
dc.contributor.authorRoslin N.T.en_US
dc.contributor.authorRoslan M.E.M.en_US
dc.contributor.authorNorhisham S.en_US
dc.contributor.authorMohd M.F.en_US
dc.contributor.authorid57195984780en_US
dc.contributor.authorid55636320055en_US
dc.contributor.authorid57190252816en_US
dc.contributor.authorid57205232728en_US
dc.contributor.authorid57189299886en_US
dc.contributor.authorid54581400300en_US
dc.contributor.authorid57205235894en_US
dc.date.accessioned2023-05-29T06:55:23Z
dc.date.available2023-05-29T06:55:23Z
dc.date.issued2018
dc.description.abstractConstruction delay is something that is inevitable, which is why it is a global problem faced by the construction industry. This paper highlighted the characteristics that influenced construction delay but usually ignored in many researches. Project type, location, and area are the characteristics that are not concerned by many. Therefore, this study is reviewing literature in construction delay to find the significance of the influence of the mentioned characteristics. It was found that there is a significant influence of the project type and location towards construction delay problems, where different project type experienced different delay causes. This was probably due to different difficulties faced by each of project type. Project location characteristic also undergoes the same pattern; which is within the same region, the same pattern of major cause was identified. Meanwhile, the insignificant level of influence was identified for the construction area characteristic. This was probably due to the readiness and awareness of contractor regarding the site condition before the construction start. It is expected that this study will open up more discussions regarding these characteristics in the future. � 2018 Authors.en_US
dc.description.natureFinalen_US
dc.identifier.doi10.14419/ijet.v7i4.35.22769
dc.identifier.epage399
dc.identifier.issue4
dc.identifier.scopus2-s2.0-85059227629
dc.identifier.spage392
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85059227629&doi=10.14419%2fijet.v7i4.35.22769&partnerID=40&md5=ece9582fe632f1ce7d4946aa3ebffd12
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/24096
dc.identifier.volume7
dc.publisherScience Publishing Corporation Incen_US
dc.relation.ispartofAll Open Access, Bronze, Green
dc.sourceScopus
dc.sourcetitleInternational Journal of Engineering and Technology(UAE)
dc.titleInfluence of project type, location and area towards construction delay: A review on significance level of delay factorsen_US
dc.typeArticleen_US
dspace.entity.typePublication
Files
Collections