Publication:
Determination of auto-recloser location using cost analysis in the sabah electricity distribution network

dc.citedby3
dc.contributor.authorHashim A.H.en_US
dc.contributor.authorMohamad A.M.en_US
dc.contributor.authorAbidin I.Z.en_US
dc.contributor.authorBaharuddin M.Z.en_US
dc.contributor.authorYeoh E.C.en_US
dc.contributor.authorid24447656300en_US
dc.contributor.authorid24448210200en_US
dc.contributor.authorid35606640500en_US
dc.contributor.authorid35329255600en_US
dc.contributor.authorid57213783399en_US
dc.date.accessioned2023-12-28T08:57:55Z
dc.date.available2023-12-28T08:57:55Z
dc.date.issued2006
dc.description.abstractSabah Electricity (SESB) operates a vertically integrated electricity utility in East Malaysia. It is currently embarking on an initiative to improve the reliability of its 11kV distribution network which is prone to trippings due to vegetation growth along their long spur lines. Apart from rentice management, another proposed solution is to install auto-reclosers (AR) at appropriate locations in their network. This work deals in developing a methodology to determine the most economic location of ARs and their numbers to be installed. In order to do that, data in the form of customer types, load levels and network topology were collected from site visits at SESB. The study then used an estimated Value of Lost Load (VoLL) to quantify the financial losses that customers suffer given a loss of supply. These losses would then be summed with the cost of ARs for a particular AR placement scenario to form an objective function. The best placement and numbers of AR can be decided by determining the least cost option from the said objective function. � 2006 IEEE.en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo4154563
dc.identifier.doi10.1109/PECON.2006.346719
dc.identifier.epage590
dc.identifier.scopus2-s2.0-46249097341
dc.identifier.spage587
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-46249097341&doi=10.1109%2fPECON.2006.346719&partnerID=40&md5=c4b0ef9ae131ad09c1d9c39633b4c00c
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/29846
dc.pagecount3
dc.publisherIEEE Computer Societyen_US
dc.sourceScopus
dc.sourcetitleFirst International Power and Energy Conference, (PECon 2006) Proceedings
dc.subjectAuto-recloser
dc.subjectBest placement option
dc.subjectCost analysis
dc.subjectCost accounting
dc.subjectElectric utilities
dc.subjectLocation
dc.subjectLosses
dc.subjectBest placement option
dc.subjectCost analysis
dc.subjectElectricity distribution networks
dc.subjectNetwork topology
dc.subjectObjective functions
dc.subjectRe closers
dc.subjectValue of lost load
dc.subjectVegetation growth
dc.subjectCost benefit analysis
dc.titleDetermination of auto-recloser location using cost analysis in the sabah electricity distribution networken_US
dc.typeConference paperen_US
dspace.entity.typePublication
Files
Collections