Publication:
Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN

dc.citedby2
dc.contributor.authorRoslan E.en_US
dc.contributor.authorMohamed H.en_US
dc.contributor.authorChan L.en_US
dc.contributor.authorIsa M.R.en_US
dc.contributor.authorid57189299886en_US
dc.contributor.authorid57136356100en_US
dc.contributor.authorid57139456500en_US
dc.contributor.authorid57193957146en_US
dc.date.accessioned2023-05-29T06:50:22Z
dc.date.available2023-05-29T06:50:22Z
dc.date.issued2018
dc.description.abstractAssessing the wind resource available at a particular site is the initial step of determining the feasibility of a wind turbine installation project. Several methods are frequently used to assess wind resource at a particular site, such as using wind map, local site measurement and measure-correlate-predict. A certain degree of measurement at site is needed for the final two methods. Wind speed data is usually measured and collected at a certain frequency or sampling rate, based on the resolution of the measurement device used. This data is then averaged at a certain period, depending on the standards used or its application. This research investigates the effect of having different averaging period when processing the raw wind speed data on the estimated power and energy potential of a wind turbine installation project at Universiti Tenaga Nasional (UNITEN), Malaysia. Results have shown that different averaging periods 2-minute and 10-seconds have 27.15% and 54.3% difference respectively to hourly averaged data in terms of energy yield estimation. These differences can affect a feasibility study of a wind turbine project. � 2018 Author(s).en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo20257
dc.identifier.doi10.1063/1.5066898
dc.identifier.scopus2-s2.0-85057284643
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85057284643&doi=10.1063%2f1.5066898&partnerID=40&md5=12b3da94c7f71d0aa86edc3be471d5e4
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/23587
dc.identifier.volume2030
dc.publisherAmerican Institute of Physics Inc.en_US
dc.sourceScopus
dc.sourcetitleAIP Conference Proceedings
dc.titleEffect of averaging period on wind resource assessment for wind turbine installation project at UNITENen_US
dc.typeConference Paperen_US
dspace.entity.typePublication
Files
Collections