Causes of delay on highway construction project in Klang valley

dc.citedby3
dc.contributor.authorKarunakaran S.en_US
dc.contributor.authorRamli M.Z.en_US
dc.contributor.authorMalek M.A.en_US
dc.contributor.authorMusir A.A.en_US
dc.contributor.authorImran N.F.en_US
dc.contributor.authorFuad N.F.S.M.en_US
dc.contributor.authorZawawi M.H.en_US
dc.contributor.authorZainal M.Z.en_US
dc.contributor.authorid57204943131en_US
dc.contributor.authorid57195984780en_US
dc.contributor.authorid55636320055en_US
dc.contributor.authorid57200119679en_US
dc.contributor.authorid57204417667en_US
dc.contributor.authorid57200211615en_US
dc.contributor.authorid39162217600en_US
dc.contributor.authorid57195979188en_US
dc.date.accessioned2023-05-29T06:50:20Z
dc.date.available2023-05-29T06:50:20Z
dc.date.issued2018
dc.description.abstractConstruction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challenging to avoid in the construction project. When the project delays, it definitely affects the cost and the quality of the project as well. The main objective of this study is to determine the factors that contributes to the delays in the highway construction project and its significance level towards the respective project. Data collection are gathered based on pilot survey and questionnaire. Then, it followed with the ranking and significance level analysis with the method of Relative Importance Index. Thus, based on the RII ranking, the top five factors was the improper planning, weather, poor site management, poor site investigation and underground utilities. The RII value for the top most and lowest factor was 0.851 and 0.671 respectively. � 2018 Author(s).en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo20242
dc.identifier.doi10.1063/1.5066883
dc.identifier.scopus2-s2.0-85058004350
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85058004350&doi=10.1063%2f1.5066883&partnerID=40&md5=8f1c3222d48a4ec6e227105f9421dfb7
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/23582
dc.identifier.volume2030
dc.publisherAmerican Institute of Physics Inc.en_US
dc.sourceScopus
dc.sourcetitleAIP Conference Proceedings
dc.titleCauses of delay on highway construction project in Klang valleyen_US