Publication: Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system
| dc.citedby | 1 | |
| dc.contributor.author | Jidin R. | en_US |
| dc.contributor.author | Othman B. | en_US |
| dc.contributor.authorid | 6508169028 | en_US |
| dc.contributor.authorid | 49561714800 | en_US |
| dc.date.accessioned | 2023-12-28T04:12:59Z | |
| dc.date.available | 2023-12-28T04:12:59Z | |
| dc.date.issued | 2013 | |
| dc.description.abstract | The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output. � Published under licence by IOP Publishing Ltd. | en_US |
| dc.description.nature | Final | en_US |
| dc.identifier.ArtNo | 12076 | |
| dc.identifier.doi | 10.1088/1755-1315/16/1/012076 | |
| dc.identifier.issue | 1 | |
| dc.identifier.scopus | 2-s2.0-84881105828 | |
| dc.identifier.uri | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84881105828&doi=10.1088%2f1755-1315%2f16%2f1%2f012076&partnerID=40&md5=739a0491197ed02cbb28904d34623a00 | |
| dc.identifier.uri | https://irepository.uniten.edu.my/handle/123456789/29417 | |
| dc.identifier.volume | 16 | |
| dc.publisher | Institute of Physics Publishing | en_US |
| dc.relation.ispartof | All Open Access; Bronze Open Access | |
| dc.source | Scopus | |
| dc.sourcetitle | IOP Conference Series: Earth and Environmental Science | |
| dc.subject | Malaysia | |
| dc.subject | Perak | |
| dc.subject | West Malaysia | |
| dc.subject | Harness | |
| dc.subject | Dams | |
| dc.subject | Hydroelectric power plants | |
| dc.subject | Rivers | |
| dc.subject | Stream flow | |
| dc.subject | Turbines | |
| dc.subject | Water levels | |
| dc.subject | Energy output | |
| dc.subject | Flowthrough | |
| dc.subject | Long duration | |
| dc.subject | Malaysia | |
| dc.subject | Output improvement | |
| dc.subject | Plant parameters | |
| dc.subject | River flow | |
| dc.subject | Small towns | |
| dc.subject | algorithm | |
| dc.subject | dam | |
| dc.subject | electricity generation | |
| dc.subject | hydroelectric power plant | |
| dc.subject | optimization | |
| dc.subject | river flow | |
| dc.subject | turbine | |
| dc.subject | water level | |
| dc.subject | Reservoirs (water) | |
| dc.title | Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system | en_US |
| dc.type | Conference paper | en_US |
| dspace.entity.type | Publication |