Publication:
Tunneling in limestone rock using TBM method for MRT projects near cochrane station

dc.contributor.authorPauzi N.I.M.en_US
dc.contributor.authorRadhi M.S.M.en_US
dc.contributor.authorWong L.S.en_US
dc.contributor.authorOmar H.en_US
dc.contributor.authorid26536518100en_US
dc.contributor.authorid56178179800en_US
dc.contributor.authorid55504782500en_US
dc.contributor.authorid7006098814en_US
dc.date.accessioned2023-05-16T02:47:50Z
dc.date.available2023-05-16T02:47:50Z
dc.date.issued2014
dc.description.abstractTunnel construction in Kuala Lumpur area are to be build due to the increasing traffic congestion in urban areas and increasing land price. Underground structure like tunneling can preserve the land above while providing a route for Mass Rapid Transport (MRT) line for transportation. MRT line in Kuala Lumpur area starts from Sungai Buluh transverse to Kajang. A Cochrane station was to be built underground at the limestone area. TBM method is used for tunneling. A total of 10 TBMs will be used for the construction of tunnels for the 9.5 km underground portion of the Sungai Buluh to Kajang line. The borehole logging method of the area reveals that the limestone rocks of the area have low to moderate strength with approximately 48 MPa to 74 MPa which was determined by unconfined compressive strength test. There are three methods of construction for tunneling such as NATM, cut and cover and rock blasting. It is practically good to used TBM method for tunneling in limestone rock. TBM was designed to handle excavation through the different geological formation. The transitions between the two geological formations in Kuala Lumpur area are such as Kenny Hill formation and karstic limestone are easier by TBM method of underground excavations. The tunneling excavation using TBM was the most suitable for Kuala Lumpur limestone area which have low to moderate strength limestone. TBM has the advantages and disadvantages depending on the type of geological found in that area. Some unforeseen geological condition may delay the rate of penetration of TBM. These unforeseen geological condition may imposed higher cost for the TBM to be repaired. This paper discussed on the suitability of TBM as method of tunneling excavations in limestone rock for underground construction of Cochrane station. © 2014, EJGE.en_US
dc.description.natureFinalen_US
dc.identifier.epage2552
dc.identifier.scopus2-s2.0-84901294442
dc.identifier.spage2535
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84901294442&partnerID=40&md5=4d9bc3f9a842bd3e227a30db78b23b4d
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/22148
dc.identifier.volume19 L
dc.publisherE-Journal of Geotechnical Engineeringen_US
dc.sourceScopus
dc.sourcetitleElectronic Journal of Geotechnical Engineering
dc.titleTunneling in limestone rock using TBM method for MRT projects near cochrane stationen_US
dc.typeArticleen_US
dspace.entity.typePublication
Files
Collections