Publication:
Testing of local control cabinet in gas insulated switchgear using design of simulation kit - Revista

dc.citedby1
dc.contributor.authorTaur A.en_US
dc.contributor.authorBadave S.M.en_US
dc.contributor.authorPadmanaban S.en_US
dc.contributor.authorBhaskar M.S.en_US
dc.contributor.authorRamachandaramurthy V.K.en_US
dc.contributor.authorHolm-Nielsen J.B.en_US
dc.contributor.authorid57195284197en_US
dc.contributor.authorid57191624336en_US
dc.contributor.authorid18134802000en_US
dc.contributor.authorid56229894300en_US
dc.contributor.authorid6602912020en_US
dc.contributor.authorid14421042300en_US
dc.date.accessioned2023-05-29T07:26:01Z
dc.date.available2023-05-29T07:26:01Z
dc.date.issued2019
dc.descriptionElectric circuit breakers; Electromagnetic wave emission; Engineering research; Partial discharges; Power electronics; Air application; Design of simulations; Gas insulated substations; Gas insulated switchgears; Local control; Power sector; Power supply; Test kits; Electric switchgearen_US
dc.description.abstractIn order to keep generation and distribution of power at high priority, two switchgear playing a key role i) Air insulated Substation/Switchgear (AIS) ii) Gas Insulated Substation/Switchgear (GIS). Nowadays, the GIS innovation began with the view of broad essential research and from that point forward the administration encounter together with creative advancement work has presented this system to a sheltered and natural good, a most dependable and accessible component of the power supply. Controllers always play a significant role in the power sector. GIS has low-Local Control Cabinet (LCC) cost and can be utilized for indoor and open-air applications. The local control cabinet is controlling part in Gas Insulated Switchgear. Its task is to follow the logic and interlocks that are set accordingly. The Problem came across while testing LCC panel is studied in this paper and solution to this is found out. In this paper, a test kit for LCC is proposed which will work as a dummy GIS bay. The contact status is found out whether NO or NC by studying connection drawings. This status fed to the relays in the kit through PLC-HMI programming and testing will be done. The proposed test simulation kit allows conducting a full functional assessment of LCC panel, panel wiring, interlock wiring, component functioning etc. � 2019 IEEE.en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo8862400
dc.identifier.doi10.1109/CPE.2019.8862400
dc.identifier.scopus2-s2.0-85074150424
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85074150424&doi=10.1109%2fCPE.2019.8862400&partnerID=40&md5=da44631487ac0c6758aacbdb1bf07ff3
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/24700
dc.publisherInstitute of Electrical and Electronics Engineers Inc.en_US
dc.sourceScopus
dc.sourcetitleProceedings - 2019 IEEE 13th International Conference on Compatibility, Power Electronics and Power Engineering, CPE-POWERENG 2019
dc.titleTesting of local control cabinet in gas insulated switchgear using design of simulation kit - Revistaen_US
dc.typeConference Paperen_US
dspace.entity.typePublication
Files
Collections