Publication:
Implementation of value engineering in optimizing project cost for sustainable energy infrastructure asset development

dc.citedby3
dc.contributor.authorLatif S.D.en_US
dc.contributor.authorUsman F.en_US
dc.contributor.authorPirot B.M.en_US
dc.contributor.authorid57216081524en_US
dc.contributor.authorid55812540000en_US
dc.contributor.authorid57220104576en_US
dc.date.accessioned2023-05-29T08:07:00Z
dc.date.available2023-05-29T08:07:00Z
dc.date.issued2020
dc.descriptionCost reduction; Floors; Value engineering; Walls (structural partitions); Building projects; Energy utilities; Malaysia; Project cost; Room size; Sustainable energy; Cost engineering; alternative energy; cost analysis; electrical property; energy planning; engineering; floor; project management; wall; Malaysiaen_US
dc.description.abstractThe purpose of this study is to optimize costs by analyzing a case study of the Energy Utility Company (EUC) project in Malaysia and building the main electric distribution station (MEDS) project specifically. In order to achieve this objective, Value Engineering (VE) technique as one of the proven tools was selected, and three alternatives were applied. The first alternative was to reduce the room sizes of the building. The second alternative was to replace the plaster painting with normal painting, and the last one was to replace painting up to 1.5 meters with 1 meter of the high of walls from the floor. Results approved that the implementation of VE has successfully reduced the cost of the project without compromising the quality of the materials. For the first alternative, 17.1% of the cost was saved. Regarding the second alternative, 69.8% of the total cost for ceiling painting was saved, and for the third alternative, 41.6% of the total cost of walls from the floor was saved. The findings of this research may serve as a guide for engineers, scholars, and constructors to reduce the cost of the building project. � 2020 WITPress. All rights reserved.en_US
dc.description.natureFinalen_US
dc.identifier.doi10.18280/IJSDP.150709
dc.identifier.epage1057
dc.identifier.issue7
dc.identifier.scopus2-s2.0-85096927434
dc.identifier.spage1045
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85096927434&doi=10.18280%2fIJSDP.150709&partnerID=40&md5=d819bc94d21c7ca3fdf3c1c6d145b4da
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/25154
dc.identifier.volume15
dc.publisherInternational Information and Engineering Technology Associationen_US
dc.relation.ispartofAll Open Access, Bronze
dc.sourceScopus
dc.sourcetitleInternational Journal of Sustainable Development and Planning
dc.titleImplementation of value engineering in optimizing project cost for sustainable energy infrastructure asset developmenten_US
dc.typeArticleen_US