Publication:
Hydrological Analysis for Inflow Forecasting into Temengor Dam

dc.citedby1
dc.contributor.authorNajid M.I.en_US
dc.contributor.authorSidek L.M.en_US
dc.contributor.authorHidayah B.en_US
dc.contributor.authorRoseli Z.A.en_US
dc.contributor.authorid57189249193en_US
dc.contributor.authorid35070506500en_US
dc.contributor.authorid57065823300en_US
dc.contributor.authorid55746324600en_US
dc.date.accessioned2023-05-29T06:12:11Z
dc.date.available2023-05-29T06:12:11Z
dc.date.issued2016
dc.descriptionArtificial intelligence; Calibration; Catchments; Dams; Decision support systems; Disasters; Flood control; Floods; Forecasting; Reservoirs (water); Runoff; Travel time; Decision supports; Flood hydrographs; Forecasting modeling; Hydrological analysis; Natural disasters; Operational decision support; Rainfall contributions; Rainfall distribution; Rain; calibration; catchment; dam; decision support system; flood; flood control; flood forecasting; hydrograph; hydrological modeling; inflow; monsoon; peak discharge; prediction; rainfall; reservoir; warning system; Malaysia; Perak; Perak River; Temenggor Reservoir; West Malaysiaen_US
dc.description.abstractThese days, natural disaster such as flood is the main concern for hydrologists. One of solutions in understanding the reason of flood is by prediction of the event sooner than normal occurrence. One of the criteria is lead time or travel time that is important in the study of fresh waters and flood events. Therefore, estimation of lead or travel time for flood event can be beneficial primary information. The objective of this study is to estimate the lead time or travel time for outlet of Temengor dam in Malaysia. Tenaga Nasional Berhad (TNB) Sungai Perak dam operation has the main contribution on decision support for early water released and flood warning to authorities and locals resident for in the down streams area. For this study, hydrological analysis carried out will help to determine which years that give more rainfall contribution into the reservoir. Rainfall contribution of reservoir help to understanding rainfall distribution and peak discharge on that period. It also help for calibration of forecasting model system for better accuracy of flood hydrograph. There may be various methods to determine the rainfall contribution of catchment. The result has shown that, the rainfall contribution for Temengor catchment, is more on November in each year which is the monsoon season in Malaysia. TNB dam operational decision support systems can prepare and be more aware at this time for flood control and flood mitigation.en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo12067
dc.identifier.doi10.1088/1755-1315/32/1/012067
dc.identifier.issue1
dc.identifier.scopus2-s2.0-84966560414
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84966560414&doi=10.1088%2f1755-1315%2f32%2f1%2f012067&partnerID=40&md5=edfd08e157baf6ee7ee7c3180fa5ac00
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/22777
dc.identifier.volume32
dc.publisherInstitute of Physics Publishingen_US
dc.relation.ispartofAll Open Access, Bronze
dc.sourceScopus
dc.sourcetitleIOP Conference Series: Earth and Environmental Science
dc.titleHydrological Analysis for Inflow Forecasting into Temengor Damen_US
dc.typeConference Paperen_US
dspace.entity.typePublication
Files
Collections