Publication:
Development a risk assessment method for dimensional stone quarries

dc.citedby1
dc.contributor.authorYari M.en_US
dc.contributor.authorJamali S.en_US
dc.contributor.authorAbdullah G.M.S.en_US
dc.contributor.authorAhmad M.en_US
dc.contributor.authorBadshah M.U.en_US
dc.contributor.authorNajeh T.en_US
dc.contributor.authorid56026981900en_US
dc.contributor.authorid56462320200en_US
dc.contributor.authorid56606096100en_US
dc.contributor.authorid58731610900en_US
dc.contributor.authorid58849655200en_US
dc.contributor.authorid57220642186en_US
dc.date.accessioned2025-03-03T07:41:23Z
dc.date.available2025-03-03T07:41:23Z
dc.date.issued2024
dc.description.abstractOver the last 20�years, the global production of dimension stones has grown rapidly. Today, seven countries?China, India, Turkey, Iran, Italy, Brazil, and Spain?account for around two-thirds of the world's output of dimension stones. Each one has annual production levels of nine to over twenty-two million tons. Mining operation in general is one of the most hazardous fields of engineering. A large amount of dimensional stone quarries require a special scheme of risk assessment. Risk Breakdown Structure is one of the major stages of risk assessment. In this paper, a detailed structure of risks of the dimension stone quarrying is formed, and divided into 17 main levels and 128 sublevels. The complexity of identifying different parameters made it requisite to use multi-attribute decision-making methods for prioritizing associated risks. As a case study, the main risks of the Ghasre Dasht marble mine are evaluated using the VIKOR method considering 10 major parameters under a Fuzzy environment. The results showed that the economic, Management, and Schedule risks are the most threatening risks of dimensional stone quarrying. ? The Author(s) 2024.en_US
dc.description.natureFinalen_US
dc.identifier.ArtNo21582
dc.identifier.doi10.1038/s41598-024-64276-1
dc.identifier.issue1
dc.identifier.scopus2-s2.0-85204238388
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85204238388&doi=10.1038%2fs41598-024-64276-1&partnerID=40&md5=1513170c123b64a2c2c10e9b06825046
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/36108
dc.identifier.volume14
dc.publisherNature Researchen_US
dc.relation.ispartofAll Open Access; Gold Open Access; Green Open Access
dc.sourceScopus
dc.sourcetitleScientific Reports
dc.subjectarticle
dc.subjectBrazil
dc.subjectdiagnosis
dc.subjecthuman
dc.subjectIran
dc.subjectItaly
dc.subjectmale
dc.subjectmining
dc.subjectrisk assessment
dc.subjectSpain
dc.subjectstone formation
dc.titleDevelopment a risk assessment method for dimensional stone quarriesen_US
dc.typeArticleen_US
dspace.entity.typePublication
Files
Collections