Publication:
Review on the challenges of hybrid propulsion system in marine transport system

dc.citedby1
dc.contributor.authorDamian S.E.en_US
dc.contributor.authorWong L.A.en_US
dc.contributor.authorShareef H.en_US
dc.contributor.authorRamachandaramurthy V.K.en_US
dc.contributor.authorChan C.K.en_US
dc.contributor.authorMoh T.S.Y.en_US
dc.contributor.authorTiong M.C.en_US
dc.contributor.authorid57605078900en_US
dc.contributor.authorid57205119530en_US
dc.contributor.authorid57189691198en_US
dc.contributor.authorid6602912020en_US
dc.contributor.authorid57157991800en_US
dc.contributor.authorid57985183500en_US
dc.contributor.authorid57221964198en_US
dc.date.accessioned2023-05-29T09:35:56Z
dc.date.available2023-05-29T09:35:56Z
dc.date.issued2022
dc.descriptionBattery storage; Electric batteries; Electric power supplies to apparatus; Electric power systems; Ship propulsion; Battery energy storage systems; Control strategies; Electrical power; Electrical systems; Fuel efficiency; Hybrid propulsion systems; Marine transport; Optimal sizing; System supply; Transport systems; Shipsen_US
dc.description.abstractHybrid propulsion systems have become more widely available as electrical systems and power supply equipment have become more integrated into maritime transportation over the past few decades. These benefits include improved compliance with international regulations, enhanced flexibility and reliability and decreased operating and maintenance costs. A key component in improving the performance of marine vessels' hybrid propulsion systems is the Battery Energy Storage System (BESS). The optimal sizing and operation must be ensured in order to fully use the installation of BESS onboard ships. This is one of the challenges associated with applying BESS in hybrid propulsion systems. This study presents a comprehensive overview of the challenges in implementing BESS to the hybrid propulsion systems found on modern commercial ships. Additionally, various technologies and the advantages of the BESS are covered. This paper concludes by addressing the future development of BESS control and performance to tackle increasingly challenging issues in the maritime transport hybrid propulsion system. � 2022 Elsevier Ltden_US
dc.description.natureFinalen_US
dc.identifier.ArtNo105983
dc.identifier.doi10.1016/j.est.2022.105983
dc.identifier.scopus2-s2.0-85142856387
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85142856387&doi=10.1016%2fj.est.2022.105983&partnerID=40&md5=362fe8f2c41bf37b83bce03a517bb7a7
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/26623
dc.identifier.volume56
dc.publisherElsevier Ltden_US
dc.sourceScopus
dc.sourcetitleJournal of Energy Storage
dc.titleReview on the challenges of hybrid propulsion system in marine transport systemen_US
dc.typeReviewen_US
dspace.entity.typePublication
Files
Collections