Publication:
Thermo-Economic Analysis of a Coal-Fired Power Plant (CFPP) Using Turbine Cycle Heat Rate and Plant Net Heat Rates at Various Operating Loads

dc.contributor.authorSingh M.S.J.en_US
dc.contributor.authorJalil N.A.A.en_US
dc.contributor.authorRahim S.A.en_US
dc.contributor.authorZulkefli Z.A.en_US
dc.contributor.authorHasini H.en_US
dc.contributor.authorid57712384500en_US
dc.contributor.authorid57713201300en_US
dc.contributor.authorid37114756400en_US
dc.contributor.authorid35340175200en_US
dc.contributor.authorid6507435998en_US
dc.date.accessioned2023-05-29T09:37:44Z
dc.date.available2023-05-29T09:37:44Z
dc.date.issued2022
dc.description.abstractEvaluating Coal-Fired Power Plant (CFPP) performance is a complex process involving the determination of the turbine cycle Heat Rate (TCHR). This study focuses on determining the TCHR by developing a mathematical model. The model, which incorporates economic analysis of the plant, is developed using energy and mass balance relationships of the turbine cycle, validated using plant commissioning data from a 700MWn CFPP located in Perak, Malaysia. Actual plant data from a 700MWn CFPP is utilized to improve the accuracy and increase the confidence of the results of this study. It was found that at the nominal operating load of 729MWg, there is a Heat Rate (HR) deviation of -1,135 kJ/kWh, leading to daily losses of RM240,447 or USD 60,112. Furthermore, it is possible to utilize the developed model at lower loads as the plant is now being used to operate on �cyclic� loads. The daily losses at a lower load of 431MWg are RM125,767 or USD31,442. Thus, the model is able to compare the plant HR at various loads against commissioning data, and economic analysis is able to be carried out effectively. Valuable information for plant operations and performance engineers could be obtained using this model to determine plant HR. � Universiti Putra Malaysia Press.en_US
dc.description.natureFinalen_US
dc.identifier.doi10.47836/pjst.30.2.08
dc.identifier.epage1018
dc.identifier.issue2
dc.identifier.scopus2-s2.0-85130814161
dc.identifier.spage1003
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85130814161&doi=10.47836%2fpjst.30.2.08&partnerID=40&md5=91f023cb3f9ed4c3780e00b18058dff2
dc.identifier.urihttps://irepository.uniten.edu.my/handle/123456789/26912
dc.identifier.volume30
dc.publisherUniversiti Putra Malaysia Pressen_US
dc.relation.ispartofAll Open Access, Hybrid Gold, Green
dc.sourceScopus
dc.sourcetitlePertanika Journal of Science and Technology
dc.titleThermo-Economic Analysis of a Coal-Fired Power Plant (CFPP) Using Turbine Cycle Heat Rate and Plant Net Heat Rates at Various Operating Loadsen_US
dc.typeArticleen_US
dspace.entity.typePublication